Tower Blocks, Leeds

Tower Blocks, Leeds

Structural strengthening and repair of various tower blocks in Leeds. All contracts were carried out with residents in occupation.
Client
Keepmoat
Duration
1 Year
Scope of works
  • Installation of Ancon remedial wall ties to secure the brickwork to the concrete structure
  • Removal of all slip bricks to boot lintels to enable a shelf angle to support the weight of the brickwork façade
  • Repairs to areas caused by removal of slip bricks
  • Concrete repairs and decorations
  • Brickwork repair and repointing
  • Mastic renewal
  • Balustrade removal and repair.
 
Structural Strengthening of Tower Blocks for Leeds PFI by Gunite1