Our initial scope of window refurbishment works included preparation works, concrete repairs, formation of a new structural movement joint and the application of an exterior grade skim to 800 windows.
Client
Byrne Group
Duration
2 Years
Scope of Works
-
13,000m² of external Doff Cleaning
-
Double dip mastic replacement to all external joints (6,000 linear metres)
-
Matched external concrete repairs
-
Decorations to all 800 window drip details
-
Structural Strengthening to 2 staircases in the form of mechanical fixing
-
Mastic joints to staircases with joints up to 40mm
-
Internal levelling
-
Concrete repairs to soffits, staircases and landings
-
Application of a sprayed applied fairing coat to all exposed concrete nibs
-
Dry packing to steel beams
-
Render works.