South Park Gardens Canal Bridge

South Park Gardens Canal Bridge

The works were carried out over the water course and required the scaffolding system to be installed from floating barges.
Client
Osborne Infrastructure
Duration
3 Months
Scope of Works
  • High pressure cleaning of all concrete surfaces
  • Concrete repairs to the bridge deck, soffit and columns
  • Installation of galvanic anodes
  • Application of anti-carbonation coatings.
osborne 1