The works were carried out over the water course and required the scaffolding system to be installed from floating barges.
Client
Osborne Infrastructure
Duration
3 Months
Scope of Works
-
High pressure cleaning of all concrete surfaces
-
Concrete repairs to the bridge deck, soffit and columns
-
Installation of galvanic anodes
-
Application of anti-carbonation coatings.