Gunite Infrastructure have waterproofed 60 linear metres of flood defence retaining wall along the banks of the river Lugg, in Herefordshire.
Client
Jackson Civil Engineering
Duration
2 Months
Scope of Works
The stone built retaining wall was initially repaired, reinforced and tanked with the Sika 1 cementitious tanking system, and a polyurethane grout curtain was installed at approx. 3mtrs depth beneath the wall to prevent ground water from the flood plain entering adjacent properties.