Over a 2 month period we upgraded the Hilton London Olympia's existing fire protection status by installing a range of passive fire protection solutions to communal corridors, risers and bin stores.
Client
Hilton Hotels
Duration
2 Months
Our Scope of Works
-
Cladding to duct work with intumescent coated batt to prevent the passage of smoke or flame around the damper.
-
Fire stopping elements included installing intumescent coated batt, mastic and intumescent wraps to holes from corridors to bedrooms, ceiling voids and riser cupboards.
