Christ’s College, Cambridge

Christ’s College, Cambridge

Working as a main contractor, Gunite was contracted to carry out the external refurbishment of the Lasdun building in a reduced contract period of 14 weeks.
Client
Christ's College
Duration
4 Months
Scope of Works
  • Concrete repairs
  • Coating and mastic renewal
  • Deck membrane application
  • Roof waterproofing
  • Window renewal
  • External lighting upgrade and protection
  • Safety line and balustrade protection
  • Paving works.
External Refurbishment of the Lasdun Building Christs College Cambridge by Gunite1