Mistley Maltings, Essex

Mistley Maltings, Essex

Over the years the high temperatures and moisture generated by the malting process led to the corrosion and deterioration of Mistley Maltings' concrete frame.
Client
Crisp Malting Group
Duration
4 Months
Scope of Works
  • Hammer testing on all concrete surfaces
  • Installing substantial propping to restrain the building and allow works to be carried out safely.
  • Beams were shuttered and sprayed concrete applied
  • Concrete repairs
  • Cementitious coating applied to protect from high temperatures and moisture
  • Painting of soffits, repair of all walkways and application of non-slip waterproof coating capable of dealing with temperatures of up to 110°C.
Extensive Refurbishment of Mistley Maltings by Gunite1