Over the years the high temperatures and moisture generated by the malting process led to the corrosion and deterioration of Mistley Maltings' concrete frame.
Client
Crisp Malting Group
Duration
4 Months
Scope of Works
-
Hammer testing on all concrete surfaces
-
Installing substantial propping to restrain the building and allow works to be carried out safely.
-
Beams were shuttered and sprayed concrete applied
-
Concrete repairs
-
Cementitious coating applied to protect from high temperatures and moisture
-
Painting of soffits, repair of all walkways and application of non-slip waterproof coating capable of dealing with temperatures of up to 110°C.