Constructed in the 1970's as office accommodation, Layden House had a complete overhaul. Water ingress had caused reinforcement corrosion and concrete deterioration. A Wykamol Basement Cavity Drainage System and Sika pore blocking watertight concrete were needed to address these problems.
Client
City of London
Duration
7 Months
Our Scope of Works
-
Sika 1 to walls & soffit
-
Combiflex to junction/joints
-
Limewash
-
Membrane to walls
-
Cavity drains to walls
-
Perimeter channel
-
Cavity drains to floor.